Zoro manufacturing facility
Manufacturing

Five deliberate steps
to perfection.

From raw botanicals to dispatch — every phase of our manufacturing process is engineered for consistency, traceability and craft.

01 / 05 · Formulation

Ingredient Sourcing & Formula Development

We begin with the brief. Our master perfumers select from 800+ raw materials — natural extracts, synthetic aroma-chemicals, and rare botanicals — to develop a precise formula that matches your brand's character.

Every formula is developed in small-batch trials, evaluated across 3–5 scent directions, and refined until it is unmistakably right. IFRA compliance is verified at this stage.

800+ raw materialsIFRA compliance check3–5 scent directionsMaster perfumer oversight
02 / 05 · Testing

Quality & Stability Testing

Before any formula reaches production, it undergoes rigorous stability, skin-safety and olfactive consistency testing across temperature and humidity cycles.

Third-party lab analysis confirms compliance with IS / BIS standards. Accelerated aging tests ensure the fragrance holds true for 24+ months in any climate.

Skin-safety patch tests24-month stability analysisIS / BIS complianceThird-party lab sign-off
03 / 05 · Production

Compound Blending & Mixing

Approved formulas move to our GMP-certified compounding facility. Industrial stainless mixing vessels ensure homogeneity at batch sizes from 50 to 5,000 litres.

Temperature-controlled blending, batch weigh logs and in-process quality checks guarantee that batch 10,000 is identical to batch one.

GMP-certified facility50–5,000L batch capacityFull batch traceabilityIn-process QC checkpoints
04 / 05 · Bottling

Filling, Capping & Crimping

Finished compound moves to our automated filling lines. Precision volumetric fillers, automated crimping and 100% fill-weight verification ensure zero waste and perfect consistency.

We support glass and aluminium bottles, atomiser pumps, roll-ons, and reed diffusers — sourced to your specification or from our approved vendor network.

Automated filling lines100% fill-weight checksGlass, aluminium, roll-onAutomated crimping & sealing
05 / 05 · Final Inspection

Packaging, Labelling & Dispatch

Filled bottles pass through a final visual inspection line before labelling, boxing and kit assembly. Every order is checked against your specification before it leaves our facility.

Dedicated shipment coordinators handle pan-India logistics and international freight. Real-time tracking and a single point of contact right up to delivery.

100% visual inspectionBranded kit assemblyPan-India logisticsReal-time shipment tracking
Capabilities

The numbers
behind our promise.

50L – 5,000L
Batch Capacity
50,000 Units
Daily Production Capacity
2.4M+ Units
Annual Output
800+ SKUs
Raw Materials Library
21–28 Days
Lead Time (Standard)
10–14 Days
Lead Time (Express)
1000 Units
Minimum Order Qty
21 Nations
Export Countries
ISO / GMP / IFRA
Certifications

Ready to manufacture
at scale?

Request Manufacturing Quote